Project Description
Customer
Alleyn Court Preparatory School
What we did
Refurbishment to existing hall to create new dining hall and kitchen
Completion
Summer 2017
Location
Southend-on-sea, Essex
Project Description
School Smart Consultants were appointed as the Clients Agent and Principle Designer to procure, co ordinate and manage the substantial refurbishment of the existing assembly hall to provide a new kitchen and dining facility.
Following comprehensive consultation with the School to ensure requirements were met, tender documents and coordinated designs were developed .
This considerable project required key considerations such as CDM regulation compliance, including notification to HSE, planning permission, suitability assessments of existing infrastructure, upgrades to electrical supplies, coordinated designs and logistics.
The work was carefully planned to ensure safety and minimal disruption to the School.
Works consisted of but were not limited to, the removal of asbestos; structural alterations; soft strip demolition; new mechanical, electrical, AV and ICT installations; new Kitchen installation; flooring; decorative panelling; and mouldings; decoration and external works.
The school benefits from a new modern kitchen facility and multi-functional hall.